Notice of Construction Activities

Water Main Replacements (Dunham Place, Plymouth Road, Lowell Road, Chatham Place)

As part of Ridgewood Water’s (RW) ongoing effort to provide you with safe and reliable drinking water to the highest quality, RW has contracted with Shauger Property Services, Inc. (Shauger) to complete water main improvements along Plymouth Road, Dunham Place, Chatham Place and Lowell Road. Improvements include the installation of a new water main as well as residential water service connection replacements, all located within the public Right of Way. Approximate work limits are shown on the attached map.

Construction is scheduled to begin the week of May 20, 2024 and is currently scheduled to be completed in about 2 months. The Borough of Glen Rock permit requirements allow work between 7:00AM and 6:00PM, Monday through Friday. During this timeframe, traffic flow is anticipated to be impacted, with detour routes planned to divert traffic around the construction area. Construction activities will require road closures; however, immediate local traffic will be provided access. Street access will be re-opened each day.

After the water mains have been installed, Shauger will notify each homeowner when the RW owned portion of the water service line supplying your residence will be replaced. At the completion of the project, Shauger will also be responsible for restoring pavement, driveways, sidewalks, lawn area and other features damaged during the work.

We regret any inconvenience and appreciate your patience and cooperation.

Please do not hesitate to contact the office of Ridgewood Water at (201) 670-5520 should you have any questions or require further clarification. If you have an Emergency, please contact Shauger at the number below as well as Ridgewood Water.